HOW A CONCRETE PROJECT WORKS

From first call to final walkthrough in Cache Valley

(435) 915-7985

Last updated: October 2026

Quick answer

A typical Cache Valley concrete job runs: estimate and written scope, permits and utility locates (call 811), excavation, compacted base, forms and steel, pour and finish, control joints, curing and a final walkthrough. Most residential jobs finish in a few days of work spread across weeks of scheduling. Call (435) 915-7985 to start with a free on-site estimate.

What to expect, in order

If you have never had concrete poured, the process can seem opaque. This guide follows a typical residential driveway or patio from first call to cleanup. Timelines vary with weather, size and scheduling, but the sequence is the same whether the job is in Logan or Richmond.

Step 1: Estimate and written scope

Call (435) 915-7985 or use the form. We visit the property, measure, check slopes, drainage and access, and talk through what you want. You receive a written scope that lists demolition, base, thickness, steel, finish, joints and cleanup. Ask questions at this stage; it is the cheapest time to change the plan.

Step 2: Decisions, permits and covenants

Confirm any HOA or subdivision rules, and check with the city or county about permits for work in the right of way, such as driveway approaches and sidewalks. Choose finish and color. Agree on a schedule.

Step 3: Call before you dig

Utah's call-before-you-dig service is Blue Stakes of Utah; dial 811 a few working days before excavation so buried lines are marked. Private lines, sprinklers and drains are not always marked, so tell us what you know.

Step 4: Demolition and excavation

Old concrete or asphalt is broken up and hauled away. We excavate to the planned depth, remove topsoil and organic material, and correct soft areas.

Step 5: Base and forms

Crushed gravel is placed in lifts and compacted. Forms are set to the line, grade and slope, with allowances for drainage and thickness. Steel reinforcement is placed on supports so it sits in the slab, not on the ground.

Step 6: Pour and finish

Ready-mix trucks deliver air-entrained concrete. The crew places it, screeds it level, floats it and applies the specified finish, whether broom, aggregate, color or stamp. Weather matters: heat, wind and cold change timing and protection.

Step 7: Joints and curing

Control joints are tooled or saw-cut so the slab cracks where intended. Curing compounds, wet covers or blankets keep moisture in so the surface gains strength. Keep foot traffic off for a day or two, and vehicles off for about a week or as instructed.

Step 8: Cleanup, walkthrough and care

Forms are stripped, debris removed, edges backfilled and grades checked. We review the slab, joints and drainage with you and give care instructions, including de-icer advice and sealing, if used. The prep and warranty guide explains what to expect for workmanship coverage.

How long does it take?

Excavation and forming for a typical driveway can take a day or two, followed by a pour day and curing. Scheduling often takes more time than work, especially in spring and early summer. Booking early gives you more options.

Where the process can slip

  • Weather: rain, wind and freezing temperatures delay pours.
  • Utility locates: late marking delays excavation.
  • Soft ground: extra excavation or base may be needed.
  • Changes after the forms are set: moving a joint or a step is much easier before the pour.
  • HOA or city approvals that are not obtained before the work.

Read the cost guide for budgeting and the cold-weather guide for late-season planning.

What to have ready for your first call

  • Your address area or town and whether the project is a driveway, patio, walk or slab.
  • Rough length and width and whether the old surface is concrete, asphalt or gravel.
  • Photos of the area, drainage problems and any cracks.
  • A sense of finish and color preferences.
  • Your target timeframe and any deadlines such as a sale or event.
  • Knowledge of HOA or city requirements.

That information lets us give a more accurate first conversation and quicker scheduling. We will confirm everything on site.

Frequently asked questions

How long does a driveway replacement take?

Work is typically a few days spread across demolition, base, forms, pour and finishing, plus curing. Scheduling and weather determine the calendar.

Do I need to be home on pour day?

It helps to be reachable for decisions, but not required. We confirm the plan and access beforehand.

What should I do to prepare?

Move vehicles, clear the area, mark sprinkler lines and gates, and tell us about pets and neighbors.

When can I walk on it?

Light foot traffic is often possible after a day or two, depending on weather and mix.